Order packing station
1Summary
Each order takes about 2 minutes 5 seconds to pack, roughly 28 orders an hour. More than a third of that time goes to finding items and handling the packing slip, not packing.
The three changes that matter most:
- Pick the day’s orders in one pass before packing. Most of the searching happens in the middle of each order. Saves 15 to 25 seconds per order.
- Move the most-used stock within easy reach, in the order it’s used. Saves 5 to 10 seconds per order.
- Prepare packaging before the session starts. Fold boxes, cut tissue and set up tape and sticker dispensers. Saves 5 to 10 seconds per order.
2What we watched
One person packing customer orders at a desk, filmed from overhead in one continuous take. We studied the video frame by frame, timed six orders from start to finish, and sorted each step into value-added work, necessary work and waste.
3Where the time goes
Orders ranged from 1 minute 20 seconds (a small bag-only order) to 2 minutes 30 seconds (a boxed order).
| Step | What the video shows | Seconds | Type |
|---|---|---|---|
| 1. Read slip and pick items | Flips through a file sorter for one design; walks off the station for a crate of small items; reaches to back drawers | 35–45 | Mostly waste |
| 2. Set out packaging | Folds the box, lays out the bag and slip | 10–15 | Necessary |
| 3. Handle the packing slip | Read, picked up again, taped in, moved: 3 to 4 touches | 10–15 | Waste |
| 4. Wrap items | Tissue or paper sleeve around the items | 30–40 | Value-added |
| 5. Seal | Seal sticker, tape torn by hand | 15–20 | Value-added |
| 6. Close in mailer | Padded mailer, closed and set aside | 15–20 | Value-added |
| 7. Clear the desk | Order moved off the work area | 5–10 | Necessary |
| Total per order | 120–165 |
4What we found
5What to change, in order
| # | Change | Cost and effort | Saves per order |
|---|---|---|---|
| 1 | Batch pick. Print a pick list for the day, pick everything once, and put each order and its slip in a small tray. | One afternoon, about $20 for trays | 15–25 sec |
| 2 | Lay out by reach and sequence. Best sellers within 16 inches of the work spot; packaging on the right in the order it’s used; slow sellers moved off the desk. | Half a day, no cost | 5–10 sec |
| 3 | Prep packaging first. Fold the day’s boxes, cut tissue to size, use a weighted tape dispenser. | 15 minutes a session | 5–10 sec |
| 4 | Handle the slip once and tick items off as they’re wrapped. That’s the final check, too. | No cost | Fewer mistakes |
| 5 | Stretch break every 30 to 45 minutes, and raise the most-used bins to cut forward reaching. | No cost | Less strain |
Changes 1 to 3 together take an order from about 2:05 to about 1:20 to 1:40.
6Before and after
Today: about 2:05 per order
Proposed: about 1:20 to 1:40 per order
7What it’s worth
At this shop’s volume of about 300 orders a week and a labor cost of $26 an hour (wages plus benefits), changes 1 to 3 are worth:
Estimates for planning. Real savings depend on which changes you make and how consistently they stick.
8What we’d confirm with you
- Your real weekly order count and how many different designs you carry.
- Where shipping labels are printed and put on.
- Whether the layered packaging is part of your brand and should stay.
Times are estimates from the video, to within about 5 to 10 seconds a step. A video review sees only what the camera sees. This report is advice based on the video, not a site visit or licensed engineering services, and you decide what to change.
Jively Consulting, a service of Jively Management Services, LLC